Leading up to a critical 100-day shutdown, our operator client made the decision to significantly increase the workload by moving a large volume of next year's repair campaign into this year.
As Eserv's AS-TEG™ digital twin solution was already in place, the client was able to strategically more than double the workload for the planned shutdown by utilising existing data that was retained within the AS-TEG™ model, without the burden of further visits to site.
Our AS-TEG™ solution enabled 6 different engineering and integrity contractors, used and lead by the operator, to collaborate and execute 34 repair orders and 5 medium-to-large piping and structural engineering modifications.
Within 10 months the AS-TEG™ platform tracked a survey cost-saving of over £270,000, and total manpower days offshore were reduced by 91. The shutdown was complete and delivered to plan, with zero failures-to-fit.
Without Eserv’s AS-TEG™ solution in place, the interruption of COVID-19 would have rendered it impossible to keep to the 100-day shutdown plan and budget.