PROJECT OVERVIEW

Following a recommendation from another FPSO O&M client, the AS-TEG™ digital twin by eserv was implemented to address the growing integrity backlog and construction failure to fit challenges. These issues were exacerbated by logistical constraints, including limited offshore bed space for personnel.

ASSET REPORT

0%

First time fit Record achieved

Successfully achieved a 100% first-time fit record by implementing digital engineering practices, eliminating the costly and time-consuming process of repeat surveys and fixes.

0

Users

Including client resource and 3rd party EPC’s and SME’s

0%

Reduction in Work cycle times

0+

Engineering deliverables

Leveraging eserv’s AS-TEG platform, the team produced over 1,900 engineering deliverables without the need for an offshore trip.

Op-ex reduction over
$4.3 million
Reduction in Co2
10.5 Tc02
Workforce saving
2038 beds

How ROI was
achieved

Collaborative work streams

Consolidated integrity management data and created a comprehensive works tream which fostered a more collaborative approach to asset integrity.

Single source data

Enhanced collaboration by addressing disjointed engineering data sources between asset management teams and third-party vendors.

Over 1900 deliverables

Leveraging eserv’s AS-TEG platform, the team produced over 1,900 engineering deliverables without the need for an offshore trip.

100% first time fit

Successfully achieved a 100% first-time fit record by implementing digital engineering practices, eliminating the costly and time-consuming process of repeat surveys and fixes.