Case Study

4 weeks of production
loss prevented

An Operator needed a stress critical pipe support to be designed and fabricated as a result of a failed nozzle that was fundamental to the integrity of one of its production critical vessels. This had resulted in a shutdown and subsequent loss of production.

By using the Eserv’s AS-TEG™ Platform, the operator’s engineering service provider was able to use the data to conduct a stress analysis and engineer a solution without an onsite survey. By controlling the legacy data, we enabled the operation to react within 24 hours, not weeks.